So guys I live in Martinsville Virginia and the beginning of 2012 Centurylink offered us 1.5 mbps flash forward to the summer of 2012 they began to lay fiber and install a new DSLAM. At the beginning of 2013 we were finally able to upgrade to 10mbps. In 2012 I had been told prism would be coming and I spoke with a local CO tech and he said my area should support bonding which has not been offered. I called this week and spoke with centurylink and was told we are due for another round of upgrades that could be as soon as next week or a few months to offer prism and up to 50mbps. My question is for those of you on the forum that know more of how the telcos work is this just BS centurylink is saying or a normal timeline of how they do upgrades the guy on the phone said the more requests out of this area for faster speeds and prism the faster it will be done and i was added to the list.
↧