Hey everyone, it looks like clink is running a new fiber line down my road from the exisiting location where there is 2 mini dslams at. Currently I'm at about 1 mile from the dslam, if they do add a new one at yellow circle on the map, would they re-route my line through the new dslam? It would be nice to get that 40/5 instead of 20/2.
Blue Line = locate marks for where the boring machine is headed towards.
Red Line = existing line to dslam (green circle)
↧