Looking for a CL Tech / Engineer's help here.
My address, states "Advanced Fiber Technology" and yet I have Bonded VDLS2 10/1M. No news here on update/upgrades. So I'm trying to take thing as far as I can so CL might help :)
Overview
Along our road CL has aerial fiber feeding an additional Cabinet up the road by a few miles. I'm roughly 9000' North of the Main Cabinet/DSLAM that has been fiber fed for years. First Picture Below shows current DSLAM/Cabinets etc.
I was first told, I'd never gain access to aerial line. But since then, CL has done aerial drops at each other road intersection within the past 6-12 months. One intersection is roughly 1000' to the south (Second Image ). There's additional equipment here as shown in the photo as well.
In our front yard we have an aerial pole that runs over to the power poles. These power poles are also where the CL aerial fiber is running to the additional cabinet about 3 miles up the road.
I'm in pretty good shape as I have Aerial Poles ready, so no boring is needed which seems to be a barrier and huge cost. What's possible with this setup? Would CL let me connect at the intersection 1000' down the road?
Also, I have had a few correspondences with the Power Company regarding pole attachment if I need to run a fiber line all the way back to Main DSLAM and connect in to CL's network.
Any addition work I should complete to give me the best shot at CL assisting me? I'm not looking to spend 200K by any means, but I don't mind shelling out a money upfront if speed can happen.